Post Tensioning Systems
Anchorage systems, strands and jacks for bonded and unbonded tendons.
Discover Post Tensioning Systems
For six decades, OVM has engineered the post-tensioning systems, stay cables and bearings that carry the world’s longest spans — now delivered across Malaysia with global R&D behind every anchorage.
USD 0M
Turnover 2025
0+
Skilled employees
0+
Patents held
0+
Countries served
A complete post-tensioning ecosystem — from the anchorage in the deck to the sensors that watch it decades later.
Anchorage systems, strands and jacks for bonded and unbonded tendons.
Discover Post Tensioning SystemsStructural bearings, isolators and dampers that absorb load and motion.
Discover Bearing and Vibrating DampingOn-site stressing, grouting and erection led by our own field engineers.
Inspection, re-stressing and cable replacement across the asset lifecycle.
Project milestones, certifications and engineering notes from across the OVM network.
SustainabilityWe joined a CSR Mangrove Planting Programme at Taman Rekreasi Paya Bakau, Kampung Sijangkang — because building a better future also means caring for the environment we share.
Read more about Together for a Greener Coastline
EventsWe joined the 19th East Asia-Pacific Conference on Structural Engineering and Construction as a Platinum Sponsor, showcasing our solutions to researchers, partners and clients from across the region.
Read more about OVM Malaysia at EASEC-19 as Platinum Sponsor
Project MilestoneOn 13 April 2026, the side-span of the P7 main girder on Sejingkat Bridge was successfully closed — a key milestone laying a solid foundation for the upcoming full-bridge closure.
Read more about Milestone Achieved: Sejingkat Bridge P7 Side-Span ClosureHighways, rail links and record-span crossings carrying OVM post-tensioning, stay-cable, bearing and expansion joint systems — from the Klang Valley to Sabah and Sarawak.
Bring us the span, the loads and the schedule. Our engineers will specify the post-tensioning, cable and bearing systems to carry it — and stay with the structure long after handover.